TFX-Railtechnik GmbH was successful in winning the order for a large K8-2 Power and Free conveyor system from Johnson Controls. The total chain length is around 1.200 meters. The system will be installed at JCI in Lueneburg, Germany.
Due to new hygienic regulations in USA, Stewart Gill Ltd re-engineered the trolley straps for the Cleantrack chain conveyor system. The new straps are exchangeable with the old types. All future chains will be fitted with the new straps.
Railtechniek van Herwijnen BV and its daughter company Railtechnique SRL from Moldova will be present in Romania at the Bucharest International Technical Fair - TIB.
After a successful installation of a large Teleflex T5 Power and Free conveyor system for Zamil Steel in Saudi Arabia, Railtechniek van Herewijnen BV received the order of new systems for India and the Emirates. The systems will be again of the type Telefex T5 with transporting loads up to 5000 kg. The value of the two orders is over 1,5 mil. Euro. The system for India will be installed at the end of 2008 and for the Emirates at the beginning of 2009.
Railtechnique France is present at the INDUSTRIE Lyon 2009. The location is EurFrom Lyon, France. Dates, 10th to 13th March 2009, Eurexpo Lyon – France